Grids

Axpo AG operates transmission and distribution networks at voltage levels of 380, 220, 110, 50 and 16 kV in order to ensure that the energy supply to its network customers is safe and reliable. The operation of these networks is safeguarded by the Energy and Network Control Center in Baden.

The networks comprise lines and substations.

Lines

  • facilitate the feed of energy generated in the power stations to the mains network
  • guarantee that the required energy is fed from the network to the customers
  • interconnect the substations

more...

Substations

  • transform the voltage from one level to another
  • serve as nodal points for connecting multiple lines and for connecting power stations and customers

more...

Energy and Network Control Center

  • The Energy and Network Control Center is located at Axpo AG's headquarters in Baden. It performs a variety of functions. The most important of these:

more...

netze_teaser_uebertragung

Lines

Substations

Substations

Energy and Network Control Center

Energy and Network Control Center

Recent articles

Inter-Regional Distribution Network

September 24, 2009

The inter-regional distribution network is generally operated at between 50 and 220 kV and ensures the supply of electricity throughout Axpo AG's entire supply area.

more...

Engineering & Construction

September 23, 2009

Axpo AG has decades of experience in the planning, design and engineering of overhead and cable lines, substations and switchgear plant.

more...

Go green and order Axpo Naturstrom electricity

September 14, 2009

Axpo Naturstrom electricity is an eco energy product and is generated fully in renewable sources in Switzerland. There are three options to choose from with a different energy mix comprising hydroelectric power, biomass and solar energy.

more...

Media news

Fisetenbach wird im Jahr 2012 an 22 Tagen ausgeleitet

May 21, 2012

Die Fassung am Fisetenbach wird über die Sommermonate in vier Phasen à fünf bzw. sechs Tage vollständig ausser Betrieb genommen.

more...

KKB: Beginn Jahresrevision Block 1

May 15, 2012

Der Block 1 des Kernkraftwerks Beznau (KKB) wird am Freitag, 18. Mai 2012, planmässig für rund sieben Wochen zur Revision mit Brennelementwechsel abgestellt.

more...

Störung bei Funktionstest des Notstandsdiesels

May 10, 2012

Bei einem regelmässigen Funktionstest des Notstandsdiesels des Blocks 2 des Kernkraftwerks Beznau ist heute eine Störung aufgetreten. Der Notstandsdiesel hat nach dem Start nicht die Nenndrehzahl erreicht und automatisch abgeschaltet.

more...

©  2009 Axpo Holding AG | All Rights Reserved